Electric vehicle charging infrastructure (IRVE)
The transition towards sustainable mobility requires robust, scalable infrastructures perfectly integrated into the electrical grid. ESTING dominates detail engineering and the processing of IRVE projects, from linked charging stations to ultra-fast charging hubs (HPC). Integrated systems with photovoltaic installations and BESS storage systems.
We offer a turnkey service for mobility operators (CPOs), shopping centers, corporate fleets and public administrations:
- Feasibility studies and network access: Identification of optimal connection points, request for technical-economic conditions from distributors and comprehensive management of access and connection permits. If you do not have access to the Internet, we have solutions disconnected from the network, totally autonomous
- Detail engineering (ITC-BT-52): Electrical design of the infrastructure, sizing of lines, protections, transformers and medium voltage cells necessary for fast (DC) and ultra-fast charging stations.
- Dynamic load management systems (SPL): We design power balancing solutions that allow the number of charging points to be maximized without the need to oversize the electrical connection of the building or facility, optimizing the CAPEX of the project.
- Legalization and Project Management: Specialized construction management, processing before Industry organizations, obtaining the final certificate of work (CFO) and management of public aid or current subsidies.